top of page
9 (1).png

Projects

Snapper Mineral Sands Project

Westlink Projects

Steel Float Line Pontoons

Origin(s)

Surabaya, Indonesia

Destination(s)

Snapper Mineral Sands Project Site, Pooncarie, New South Wales

Market

Mining & Resources

Sector

Base Minerals

Year

2010

Equipment

Steel Float Line Pontoons

Total Weight

3,000 mt

Project Detail

Westlink was engaged to provide a multimodal logistics solution for of two hundred and twelve (212) steel float line pontoons from Surabaya, Indonesia to Pooncarie, New South Wales, to be used in the construction of a floating wet concentrator for Cristal Resources Snapper Mineral Sands Project.

Scope

  • Pre-shipment inspections at fabrication yard in Surabaya, Indonesia 

  • Tug and barge – from fabrication yard to vessel hook at Surabaya anchorage 

  • Multipurpose Vessel (MPP) – Surabaya to Adelaide 

  • Oversized haulage – vessel hook to Snapper Mineral Sands Project site at Pooncarie 

  • Construction coordination – coordination with site team to unload trailers into laydown

Highlights

  • Zero LTIs 

  • 10,000 cubic metres (cbm) of steel with heaviest lift 80 metric tons 

  • MPP interface with tug and barge Police escorted transport of oversized pontoons from Adelaide to project site 520 kilometres away 

  • Delivery to laydown at Snapper Mineral Sands Project site without disruption to construction activities

bottom of page