Snapper Mineral Sands Project
Westlink Projects
Steel Float Line Pontoons

Origin(s)
Surabaya, Indonesia
Destination(s)
Snapper Mineral Sands Project Site, Pooncarie, New South Wales
Market
Mining & Resources
Sector
Base Minerals
Year
2010
Equipment
Steel Float Line Pontoons
Total Weight
3,000 mt
Project Detail
Westlink was engaged to provide a multimodal logistics solution for of two hundred and twelve (212) steel float line pontoons from Surabaya, Indonesia to Pooncarie, New South Wales, to be used in the construction of a floating wet concentrator for Cristal Resources Snapper Mineral Sands Project.
Scope
Pre-shipment inspections at fabrication yard in Surabaya, Indonesia
Tug and barge – from fabrication yard to vessel hook at Surabaya anchorage
Multipurpose Vessel (MPP) – Surabaya to Adelaide
Oversized haulage – vessel hook to Snapper Mineral Sands Project site at Pooncarie
Construction coordination – coordination with site team to unload trailers into laydown
Highlights
Zero LTIs
10,000 cubic metres (cbm) of steel with heaviest lift 80 metric tons
MPP interface with tug and barge Police escorted transport of oversized pontoons from Adelaide to project site 520 kilometres away
Delivery to laydown at Snapper Mineral Sands Project site without disruption to construction activities