top of page
9 (1).png

Projects

SAPN Kangaroo Island Power Cable Project

Westlink Projects

1 x Power Cable Basket and accessories

Origin(s)

ZTT Nantong, Nantong, China

Destination(s)

Adelaide, Australia

Market

Other Sectors and Markets

Sector

Power

Year

2018

Equipment

1 x Power Cable Basket and accessories

Total Weight

836 mt

Project Detail

Westlink was engaged by a customer to provide a multimodal logistics solution for a 750 metric ton power cable basket fabricated and spooled in Nantong, China to be used in the construction of a new power cable from Kangaroo Island to Adelaide in South Australia.

Scope

  • Crane barge – lifting of empty cable basket onto self-propelled barge 

  • Self-propelled barge – spooling of power cable into empty basket at ZTT Nantong 

  • Self-propelled barge – transfer of full cable basket from ZTT Nantong to Long Wu Terminal, Shanghai 

  • Heavy Lift Vessel (HLV) – lift and load full power cable basket from self-propelled barge 

  • Heavy Lift Vessel (HLV) – Shanghai, China to Adelaide, Australia to meet construction vessel to discharge power cable basket and accessories

Highlights

  • Zero LTIs 

  • Heavy lift of 750 metric ton Spooling of fifteen (15) kilometres of power cable onto empty cable basket onto self-propelled barge 

  • Vessel to vessel transfer – lift of full cable basket from self propelled barge to HLV 

  • Vessel to vessel transfer – direct delivery of laden cable basket from HLV to construction vessel 

  • On time delivery met tight construction window dictated by seasonal harsh weather conditions 

  • The longest continuous undersea cable to be installed in Australia

bottom of page