Project Detail

Westlink was entrusted to manage the international transportation of a large gas compressor package comprising of Reciprocating and Screw compressor skids, including coolers and auxiliary equipment. The equipment was moved by Westlink from the manufacturing facility in Calgary, Canada to the project site in Roma, Australia for the construction and commissioning of the Roma North Gas Expansion Project.

Scope

  • Heavy haulage – from factory in Calgary to loading port in Tacoma, Canada 

  • Pre-shipment quarantine treatment of gas compressor package at loading port 

  • Roll-On-Roll-Off Vessel (RoRo) – Tacoma, Canada to Brisbane, Australia 

  • Heavy haulage – Brisbane to Roma project site in Queensland, Australia

Highlights

  • Zero LTIs 

  • Specialist lifting, lashing and stowage design, and planning 

  • Flexible shipping schedules to meet dynamic fabrication and installation schedules 

  • Air freight support for critical parts and materials 

  • Construction coordination with site team to unload trailers for direct installation or laydown