Origin APLNG Project

Westlink Projects

Concrete and FBE Coated Line Pipe

Origin(s)

Kuantan, Malaysia

Destination(s)

Origin APLNG Project Site, Gladstone, Australia

Market

Energy & Chemicals

Sector

LNG

Year

2012

Equipment

Concrete and FBE Coated Line Pipe

Total Weight

180,000 mt

Project Detail

Westlink was engaged to provide a multimodal logistics solution for 520 kilometres of large diameter concrete and FBE coated line pipe from a coating facility in Kuantan to Gladstone Port for Origin’s APLNG Project. The delivered pipe was used in for the construction of a high-pressure gas transmission line for the project to connect gas fields in the Surat and Bowen Basins to the newly constructed LNG plant on Curtis Island in Australia.

Scope

  • Pre-shipment quarantine inspection at WASCO coating yard in Kuantan, Malaysia 

  • Holiday testing and cleaning of line pipe at coating yard prior to loading on vessel 

  • Multipurpose Vessel (MPP) – Kuantan, Malaysia to Gladstone, Australia 

  • Haulage – delivery and marshalling within Gladstone Port limits at laydown yard

Highlights

  • Zero LTIs 

  • 365,000 cubic metres (cbm) of pipe delivered 

  • Specialised vessel selection used for 11 consecutive monthly breakbulk shipments 

  • Large 42 inch (in) diameter pipe 

  • Zero damage to sensitive pipe coating in handling and stow