Grosvenor Coal Preparation Plant Extension Project

Conveyor System and Processing Plant

Grosvenor Coal Preparation Plant Extension Project

Origin(s)

Tianjin, China

Destination(s)

Anglo American Grosvenor project site, Australia

Market

Mining & Resources

Sector

Coal

Year

2014

Equipment

Conveyor System and Processing Plant

Total Weight

2,400 mt

Project Detail

Westlink was engaged to provide a multimodal logistics solution for stick steel, modules and other fabrications for conveyor systems and processing plant fabricated in Tianjin, China to be used in the construction of a coal preparation plant extension project at Anglo American’s Grosvenor operation southwest of Mackay, Australia.

Scope

  • Multipurpose Vessel (MPP) – Lingang, Tianjin to Mackay 

  • Oversize Haulage – Port of Mackay to Grosvenor project site

Highlights

  • Zero LTIs 

  • 20,000 revenue tonne with heaviest lift 40 metric ton 

  • Full and complete ship charter with maximised stow to reduce ocean freight cost 

  • Transport of modules and fabrications to project site nearly 200 km from Mackay