Project Detail
Westlink was engaged to provide a multimodal logistics solution for structural steel, hoppers, chutes and bins from Tianjin and Qingdao, China to be used in the construction of a new grain export terminal for G3 in North Vancouver, Canada.
Scope
Pre-shipment quarantine inspection and factory completion of ore cars in China
Multipurpose Vessel (MPP) – Tianjin and Qingdao, China to Lynnterm Vancouver, Canada
Oversized Haulage – vessel hook or laydown to G3 project site
Construction coordination – coordination with site team to unload trailers for direct install or laydown
Highlights
Zero LTIs
35,000 cubic metres (cbm) of steel with heaviest lift 40 metric tons
10 consecutive monthly breakbulk shipments and weekly flat rack deliveries
Delivery of oversized structural steel delivery and 200 x 40’ flat racks
Transport of oversized pieces through built up urban area
Traffic control in Vancouver – escorts, temporary removal of street signs, traffic control and permits
Delivery to installation points at G3 project site