Fertiliser Plant Shutdown Works

Westlink Projects

Process Vessels

Origin(s)

Nansha, China Hazira, India Scanzorosciate, Italy

Destination(s)

Burrup Peninsula, Australia

Market

Other Sectors and Markets

Sector

Chemical

Year

2018

Equipment

Process Vessels

Total Weight

270 mt

Project Detail

Westlink was engaged to provide multimodal logistics solutions for several process vessels including two pressure vessels and a desalination system, all stemming from various fabrication origins from around the world. These vessels were delivered and installed as major shutdown works for a fertiliser plant located at the Burrup Peninsula in Australia.

Scope

  • Heavy Lift Vessels (HLVs) – Port of Origin(s) to Dampier 

  • Roll-On-Roll-Off Vessel (RoRo) – Port of Origin to Fremantle Craneage – at various locations at ports and at delivery points at site 

  • Heavy Haulage – Port of Discharge to Burrup Peninsula fertiliser plant

Highlights

  • Zero 

  • LTIs Heavy lift and haulage for 130 metric ton (mt) 

  • Oversize transport envelope – 20 x 9 x 6 metres 

  • Met all tight installation windows for delivery 

  • Heavy haulage through to congested site installation points 

  • No disruption to fertiliser production