top of page
9 (1).png

Projects

2008 Dampier Bunbury Pipeline Upgrade

Westlink Projects

Coated Line Pipe

Origin(s)

Kuantan, Malaysia

Destination(s)

Geraldton and Henderson, Australia

Market

Energy & Chemicals

Sector

Domestic Gas

Year

2008

Equipment

Coated Line Pipe

Total Weight

39,000 mt

Project Detail

Westlink was engaged to provide a multimodal logistics solution for 260 kilometres of 3LPE coated line pipe from Kuantan to two different ports in Australia, namely Geraldton and Henderson. The line pipe was required for upgrades to two sections of the Dampier Bunbury Pipeline (DBP) – Stages Neerabup B and 5B. The DBP is critical infrastructure that delivers gas to residents and industry of Western Australia.

Scope

  • Pre-shipment quarantine inspection at coating yard in Kuantan, Malaysia 

  • Multipurpose Vessel (MPP) – Kuantan, Malaysia to either Geraldton or Henderson, Australia 

  • Haulage, unloading and marshalling – delivery of line pipe within port limits at laydown yard

Highlights

  • Zero LTIs 

  • 115,000 cubic metres (cbm) of pipe delivered 

  • Specialised vessel selection used for 8 consecutive breakbulk shipments 

  • Design and fabrication of steel bolsters for safe damage-free stowage 

  • Zero damage to sensitive pipe coating in handling and stow

bottom of page