top of page
9 (1).png

Projects

Covalent Lithium Refinery Project

Westlink Projects

59 x Oversize Process Tanks

Origin(s)

Kwinana, Western Australia

Destination(s)

Kwinana, Western Australia

Market

Mining & Resources

Sector

Battery Minerals

Year

2023

Equipment

59 x Oversize Process Tanks

Total Weight

1,100 mt

Project Detail

Westlink managed the turnkey end-to-end logistics of fifty-nine (59) oversize process tanks from a local fabrication yard to the Covalent Lithium Refinery project site in Kwinana.

Scope

  • Pre-shipment inspections at fabrication yard 

  • Craneage – loading trailers with tanks at fabrication yard 

  • Oversized Haulage – fabrication yard to Kwinana project site 

  • Oversized Traffic Management – escorts, wardens and overhead powerline management 

  • Construction Coordination – coordination with site team to unload trailers into laydown or direct installation

Highlights

  • Zero LTIs 

  • No missed warden / escort dates 

  • Laydown management with delivery coordination to site according to construction schedule 

  • Various bespoke trailer layout and lashing designs due to individual design of each tank 

  • Safe and seamless traffic management through busy built up industrial / urban area of Kwinana

bottom of page