Jadestone Energy Montara Subsea Upgrade
- Westlink Logistics
- Jun 26, 2019
- 1 min read

Westlink has transported a 9.2m Umbilical Reel from Oceaneering’s facility in Rosyth, Scotland through to the Darwin, Australia. The reel was discharged shoreside at the East Arm Wharf using the Heavy Lift Vessel’s cranes. On completion of the discharge the Offshore Installation Vessel loaded the reel to execute the installation scope of the project.
Excecuted July 2019