PROJECT HIGHLIGHT
ONEPACE
PROJECTS
Snapper Mineral Sands Project
MARKET MINING | SECTOR BASE MINERALS
Origin(s)
Surabaya, Indonesia
Destination(s)
Snapper Mineral Sands Project Site, Pooncarie, New South Wales
Project
Snapper Mineral Sands Project
Equipment
Steel Float Line Pontoons
Total Volume
10,000 cbm
Total Weight
3,000 mt
Heaviest Lift
80 mt
Year
2010
PROJECT OVERVIEW
Westlink was engaged to provide a multimodal logistics solution for of two hundred and twelve (212) steel float line pontoons from Surabaya, Indonesia to Pooncarie, New South Wales, to be used in the construction of a floating wet concentrator for Cristal Resources Snapper Mineral Sands Project.
SCOPE
-
Pre-shipment inspections at fabrication yard in Surabaya, Indonesia
-
Tug and barge – from fabrication yard to vessel hook at Surabaya anchorage
-
Multipurpose Vessel (MPP) – Surabaya to Adelaide
-
Oversized haulage – vessel hook to Snapper Mineral Sands Project site at Pooncarie
-
Construction coordination – coordination with site team to unload trailers into laydown
Mining Specific Logistics
HIGHLIGHTS
-
Zero LTIs
-
10,000 cubic metres (cbm) of steel with heaviest lift 80 metric tons
-
MPP interface with tug and barge
-
Police escorted transport of oversized pontoons from Adelaide to project site 520 kilometres away
-
Delivery to laydown at Snapper Mineral Sands Project site without disruption to construction activities