PROJECTS
Lubrizol Zeus Project
MARKET ENERGY SECTOR PETROCHEMICAL
Origin(s)
Lingang, Tianjin, China
Destination(s)
Lubrizol Deer Park Facility
Houston, USA
Project
Lubrizol Zeus Project
Equipment
26 x Pipe Rack Modules
Total Volume
32,000 cbm
Total Weight
1,100 mt
Heaviest Lift
70 mt
Year
2018
PROJECT OVERVIEW
SCOPE
-
SPMT – fabrication yard to vessel hook at Lingang
-
Heavy Lift Vessel (HLV) – Lingang, Tianjin to Industrial Terminals, Houston
-
SPMT – vessel hook to laydown at Industrial Terminals, Houston
-
SPMT, tug and barge RORO operations – Industrial Terminals, Houston to Spilman Island laydown
-
Heavy Haulage – from Spilman Island laydown to Lubrizol Deer Park Project site
HIGHLIGHTS
-
Zero LTIs
-
32,000 cubic metres (cbm) transported with heaviest lift 70 metric ton (mt)
-
‘Flying Deck’ configuration used on HLV to maximise stow
-
Custom spreader and rigging arrangement for each pipe rack for true vertical lifts
-
Transport of modules through busy Houston Industrial Area
-
Traffic control in Houston – police escorts, temporary removal of traffic lights, street signs and lifting of overhead lines
-
Maximum module envelope – 36 x 9.5 x 8.5 metres