top of page
PROJECTS

Hanson Bass Point Quarry Expansion

Westlink-Hansons-Bass-Point-Cement-Quarr
MARKET MINING  |  SECTOR BASE MINERALS
Origin(s)

Tianjin and Qingdao

Destination(s)

Bass Point Quarry, NSW, Australia

Project

Hanson Bass Point Quarry Expansion

 
Equipment

Stick Steel, Trusses, Hoppers, Chutes, Bins and other Steel Fabrications

Total Volume

15,000+ cbm

Total Weight

3,100+ mt

Heaviest Lift

150 mt

Year

2018

PROJECT OVERVIEW

SHARE
  • White LinkedIn Icon
  • White YouTube Icon
  • White Facebook Icon

Westlink managed the turnkey end-to-end logistics of stick and modular steel fabrications from Tianjin and Qingdao, China to Bass Point in NSW, Australia for an expansion project at Hanson’s Bass Point Cement Quarry.

SCOPE

  • Pre-shipment inspections at fabrication yards in Tianjin and Qingdao, China

  • Multipurpose Vessel (MPP) – Tianjin and Qingdao, China to Port Kembla, Australia

  • Oversized Haulage – Port Kembla to Bass Point, Australia

  • Construction coordination – coordination with site team to unload trailers into laydown

Mining Specific Logistics

HIGHLIGHTS

  • 15,000 cubic metres (cbm) of steel with heaviest lift 150 metric tons

  • Four (4) consecutive breakbulk and heavy lift shipments

  • Transport of oversized pieces through built up urban area to project site

  • Management of staging yard to effectively coordinate deliveries to project site

  • Delivery to installation points and laydown at Bass Point Quarry project site

GALLERY

bottom of page