PROJECT HIGHLIGHT
ONEPACE
PROJECTS
Dampier Bunbury Pipeline Upgrade
MARKET ENERGY | SECTOR DOMESTIC GAS
Origin(s)
Kuantan, Malaysia
Destination(s)
Geraldton and Henderson, Australia
Project
Dampier Bunbury Pipeline Upgrade
Equipment
Coated Line Pipe
Total Volume
115,000 cbm
Total Weight
39,000 mt
Longest Pipe Dimensions
26 inch and 18 m long
Year
2008
PROJECT OVERVIEW
SHARE
Westlink was engaged to provide a multimodal logistics solution for 260 kilometres of 3LPE coated line pipe from Kuantan to two different ports in Australia, namely Geraldton and Henderson. The line pipe was required for upgrades to two sections of the Dampier Bunbury Pipeline (DBP) – Stages Neerabup B and 5B. The DBP is critical infrastructure that delivers gas to residents and industry of Western Australia.
SCOPE
-
Pre-shipment quarantine inspection at coating yard in Kuantan, Malaysia
-
Multipurpose Vessel (MPP) – Kuantan, Malaysia to either Geraldton or Henderson, Australia
-
Haulage, unloading and marshalling – delivery of line pipe within port limits at laydown yard
Mining Specific Logistics
HIGHLIGHTS
-
Zero LTIs
-
115,000 cubic metres (cbm) of pipe delivered
-
Specialised vessel selection used for 8 consecutive breakbulk shipments
-
Design and fabrication of steel bolsters for safe damage-free stowage
-
Zero damage to sensitive pipe coating in handling and stow