We provide safe turnkey logistics
FOR OUR CUSTOMERS GLOBAL PROJECTS AND OPERATIONS
We provide safe turnkey logistics
FOR OUR CUSTOMERS GLOBAL PROJECTS AND OPERATIONS
We provide safe turnkey logistics
FOR OUR CUSTOMERS GLOBAL PROJECTS AND OPERATIONS
We provide safe turnkey logistics
FOR OUR CUSTOMERS GLOBAL PROJECTS AND OPERATIONS
PROJECT HIGHLIGHT
ONEPACE
PROJECTS
Rio Tinto Cape Lambert Phase 2 Project
MARKET MINING SECTOR IRON ORE
Origin(s)
Tianjin and Qingdao, China
Destination(s)
Rio Tinto Cape Lambert, Australia
Project
Rio Tinto Cape Lambert Phase 2 Project
Equipment
Structural Steel Sections, Large Bins and Modules for new screenhouse
PROJECT OVERVIEW
Total Volume
75,000 cbm
Total Weight
11,200 mt
Heaviest Lift
300 mt
Year
2014
SHARE
Westlink was engaged to provide a multimodal logistics solution for structural steel sections, large bins and modules fabricated in Tianjin and Qingdao, China to be used in the construction of an iron ore screenhouse at Rio Tinto’s Cape Lambert operations in the Pilbara region of Australia.
SCOPE
-
SPMT and heavy haulage – fabrication yard to vessel hook at Tianjin and Qingdao
-
Heavy Lift Vessel (HLV) – Tianjin and Qingdao to Port Hedland and Port Walcott
-
Tug and barge – Port Walcott to Cape Lambert barge landing facility
-
SPMT – barge landing to screenhouse project site at Rio Tinto Cape Lambert operations
HIGHLIGHTS
Mining Specific Logistics
-
Zero LTIs
-
75,000 cubic metres (cbm) transported with heaviest lift 300 metric ton (mt)
-
3 x full charter consecutive shipments
-
Maximum module envelope – 38 x 11.5 x 8 metres
-
HLV and tug and barge set interfacing
-
Zero tides missed for barge operations
-
Two kilometres to site via SPMT roll-off from barge with zero disruption to mining operations
-
Direct install from SPMT delivery point