PROJECTS
Origin TOGGS Project
MARKET ENERGY | SECTOR COAL SEAM GAS
Origin(s)
Lingang, Tianjin, China
Destination(s)
Chinchilla, Australia
Project
Origin TOGGS Project
Equipment
Gas Processing Modules, Piping and Fabrications
Total Volume
6,000 cbm
Total Weight
1,000 mt
Year
2019
PROJECT OVERVIEW
Westlink was engaged to provide a multimodal logistics solution for gas processing modules, piping and structural steel fabricated in Tianjin, China to be used in the construction of the new Talinga Orana Gas Gathering Station (TOGGS) project for Origin Energy in Chinchilla, Queensland, Australia.
SCOPE
-
Heavy haulage – fabrication yard to vessel hook at Lingang
-
Heavy Lift Vessel (HLV) – Lingang, Tianjin to Australian Amalgamated Terminals, Brisbane
-
Heavy haulage – vessel hook to TOGGS Project site in Chinchilla
Mining Specific Logistics
HIGHLIGHTS
-
Zero LTIs
-
6,000 cubic metres (cbm) transported with heaviest lift 70 metric ton (mt)
-
Oversized transport of modules from Brisbane to project site 300 kilometres away in Chinchilla
-
Maximum module envelope – 16.5 x 7 x 5 metres
-
Delivery one month ahead of project schedule