Offshore LNG Development

Hero.jpg
MARKET ENERGY  |  SECTOR LNG
Origin(s)

Kabil, Batam, Indonesia

Destination(s)

Dampier, Australia

Project

Offshore LNG Development 

Equipment

4 x Suction Piles

Total Volume

1,400 cbm

Total Weight

320 mt

Heaviest Lift

80 mt

Maximum Length

22 m

Year

2020

PROJECT OVERVIEW

Westlink managed the full end-to-end logistics management for the transportation and delivery of steel suction piles from Kabil, Batam, Indonesia to Dampier, Australia. These suction piles were used in subsea installation for an offshore LNG development.

SCOPE

  • Pre-shipment quarantine inspection at pile fabrication yard in Kabil, Batam, Indonesia

  • Multipurpose Vessel (MPP) – Kabil, Indonesia to Dampier, Australia

Mining Specific Logistics

HIGHLIGHTS

  • Zero LTIs

  • Marine Warranty Surveyor approval and compliance

  • Specialist lifting, lashing and stowage design and planning

  • Large four (4) metre diameter piles