PROJECT HIGHLIGHT
ONEPACE
PROJECTS
Onslow Iron Ore Project

MARKET MINING | SECTOR IRON ORE
Origin(s)
Tianjin, China
Destination(s)
Ashburton, Western Australia
Project
Onslow Iron Ore Project
Equipment
Structural Steel Sections for new Port Storage Shed
Total Volume
15,000 cbm
Heaviest Lift
30 mt
Year
2023
PROJECT OVERVIEW
Westlink was engaged to provide end-to-end logistics management for structural steel sections for the Onslow Iron Ore Project. The project involved the transportation of 15,000 cubic meters of structural steel from Tianjin, China, to Ashburton, Western Australia. The delivered steel was critical for the construction of the Port Storage Shed which was a critical part of the project for iron ore storage prior to export shiploading.
SCOPE
-
Pre-shipment quarantine inspection of structural steel in China
-
Multipurpose Vessel (MPP) - Tianjin, China, to Onslow, Western Australia
-
Oversized and Conventional Haulage from port to Onslow Iron project site
-
Construction coordination – coordination with site team to unload trailers for direct install or laydown
HIGHLIGHTS
-
Zero LTIs
-
Maximised preassembly and stackability of sections to reduce logistics costs and delivery schedule
-
Port selection to minimise distance to site and cost of transport
-
Specialised extendable trailers used for 40 m long structural steel pieces
-
Laydown management with delivery coordination to site according to construction schedule